Recreational

Alumni Stadium - University of Guelph

Alumni Stadium – University of Guelph

In 2012, UofG completed a retrofit of the Alumni Stadium. We were a part of the design-build project team that included: Davan Site Contractors MBTW Group – Landscape Architects MJS Consulting – Electrical Engineer The project scope generally included: replacement of natural turf with an artificial surface extensive under drainage system and in-ground Storm Water Management […]

Weston Golf Club - Ponds

Weston Golf Club – Ponds

Weston Golf and Country Club recently modified the pond on Hole 2, and added a new pond on Hole 3.  These changes provide the golf course with improved irrigation capability and increased storage capacity – necessary for golf course maintenance. Completion of this project required: design of an energy dissipation structure for the existing storm […]

Guelph Soccer Dome

Guelph Soccer Dome

We provided consulting engineering services to Guelph Soccer, to assist with development of the Guelph Soccer Dome project, on a site located adjacent to the Centennial high school. Our scope included typical site servicing.  The storm water management solution was primarily an extensive on-site infiltration system, required to handle the increased runoff from the dome […]


Irrigation Pond - Cutten Club, Guelph

Irrigation Pond – Cutten Club, Guelph

The Cutten Club recently completed a major restoration project – including a new irrigation system, and reconstructed bunkers throughout the golf course.  The irrigation system project was preceded by the construction of a new storage pond on Holes 11 / 17, with a new pumping station, with transfer capability from the Eramosa River, under the […]