We provided consulting engineering services to Guelph Soccer, to assist with development of the Guelph Soccer Dome project, on a site located adjacent to the Centennial high school.
Our scope included typical site servicing. The storm water management solution was primarily an extensive on-site infiltration system, required to handle the increased runoff from the dome surface.